History of the Otley Bridge (and the footbridge!)

Otley Bridge - Otley Museum Archive
Otley Bridge c 1887

Otley Bridge, located in Otley, Leeds, spans the River Wharfe, linking the two halves of Otley Town. The bridge has elements of three distinct periods of building – the original bridge of 1228/29, the repairing, widening and lengthening of the bridge in 1775/76 and the addition of the cantilevered bridge in 1957. The bridge has been essential for local transport, offering the nearest crossing point for miles.

Inevitably, over its 800-year lifespan, Otley Bridge has evolved through multiple periods of construction and repair, reflecting the changing needs of the town while maintaining its historical importance. Otley Bridge is a Scheduled Ancient Monument, which means it is protected due to its historical significance.

Early Origins (13th Century)

The original Otley Bridge was built around 1228, commissioned by the Archbishop of York, who was the Lord of the Manor at that time. The bridge was constructed to provide a more direct route to York, replacing earlier fords (shallow crossing points). The early bridge had five semi-circular arches, which were designed to support a cart’s width, and its stone was likely quarried from nearby hills.

17th Century Repairs

In 1673, the bridge was heavily damaged due to severe flooding.  Repairs took place over the next few years, ensuring that the bridge could continue to serve the community.  Despite the damage, some original elements of the bridge, such as the ribbed arches, were preserved, showing the structure’s medieval craftsmanship.

drawing of Otley Bridge from Paul Wood
Drawing from Paul Wood’s article Otley Local History Bulletin*

Reconstruction and Expansion (18th Century)

By the 1770s, the bridge had fallen into disrepair. John Gott, a respected surveyor, was commissioned to oversee the rebuilding and widening of Otley Bridge. His work included adding two new arches and expanding the bridge to accommodate increasing traffic. These changes modernised the bridge while retaining key elements from the original 13th-century structure.

Otley Bridge Circa 1895
c 1895

20th Century Changes

With the rise of motor vehicles and increasing pedestrian traffic, various schemes to provide safer pedestrian crossings were created.  In 1934, a detached footbridge was planned but not implemented.  Again in 1952, another footbridge was planned but deemed too expensive. 

Otley Bridge Circa 1946
c 1946

The traffic jams continued, so the next iteration was developed in 1956 and, this time, the cantilevered footbridge was built in 1957, costing about £10,000.

Otley Bridge 1957 with cantilevered footbridge under construction.
1957
Otley Bridge and Footbridge 1957
1957
Double Decker bus crossing Otley Bridge.
Date unknown - probably 1960s

* Further information can be found on the Otley Local History Bulletin.

2024/2025 Footbridge Improvements

It’s now time to replace the footbridge due to wear and tear over the last 60-odd years. 

Leeds City Council has proposed major refurbishment plans which are expected to be complete by late Summer 2025.

For more information visit: https://otleybridge.commonplace.is/